11 CV1800 and CVMAX Installation Guide
© Clear Vue Cyclones 2018
Constructing the Hanger Plate & Motor Assembly
1. Assemble the threaded rod hardware:
a. Set up (4) threaded rods with the items shown. Leave about 2 to 2 ½” between item
groups.
2. Locate the motor plate – it is the round disc secured to the top of the blower housing with (6)
clips. Separate it from the blower housing by removing the (6) clips and associated
hardware. Set these clips and hardware aside.
3. Insert (1) threaded rod assembly into each hole of the
motor plate, with the hardware situated down.
a. Thread rod into T-nuts until they almost “bottom out”.
The T-nuts are installed on the rabbet side, which is
facing down in the picture. Make sure the T-nuts are on
the bottom side before inserting the threaded rod from
the top.
b. Once installed, the top washer should be approximately
4” above the motor plate.
c. Repeat for (3) remaining threaded rod assemblies.
4. Slide the hanger plate onto the threaded rod assemblies.
The strips on the hanger plate should be facing UP.
5. Install the remaining hardware above the
hanger plate as pictured.
a. Leave the ¼”-20 nuts above and
below the hanger plate loose as
they will be used to level the
cyclone after it is hung.
¼”-20
flat
washer
¼”-20
l
ock
washer
¼”-20
nut
¼”-20
nut
¼”-20
flat
washer
5
∕
16
” x 1”
rubber
bushing
2 – 2 ½”
4”
¼”-20
flat
washer
5
∕
16
” x 1”
rubber
bushing
¼”-20
nuts