9 CV1800 and CVMAX Installation Guide
© Clear Vue Cyclones 2018
Installing Clear Vue Wall Mounting Brackets*
1. Assemble legs:
a. Secure (1) horizontal leg and (1) vertical leg of the
bracket using bolts and nuts provided. Orientation of
bolt-head does not matter.
b. Follow same procedure for second bracket.
2. Measure where top of the crossbar will be mounted on the
wall and mark accordingly. Our 8’ installation requires the
top edge of crossbar to be mounted at 95.5”.
If your ceilings are higher than 8’ and you are using a collection drum that is
taller than 27”, you will need to increase the mounting height of your brackets
accordingly. The measurement does not need to be exact – a longer length
of flex hose can be used between the base of the cyclone and collection drum
to take up any excess height.
3. Slide assembled legs onto crossbar.
a. Position legs accordingly – the legs can be
spaced so that the hanger plate is situated either
lengthwise or widthwise.
4. Mount crossbar to the studs of the wall, using 3” lag
bolts (not included).
a.
Note: some customers may choose to mount the
brackets to a piece of plywood before mounting to
the studs. Ensure the plywood extends the entire assembled height of the brackets.
If you choose to mount the crossbar to the wall first before attaching the legs, use
the inner holes for mounting as the legs will not slide past the lag bolts. Once
legs are attached, you can the fasten lag bolts in the outer set of holes as well.
*For brackets purchased after 02/01/2016. Please contact Customer Service for
assembly instructions for brackets purchased prior to this date.
Horizontal
legs
Vertical legs
Crossbar