Page 12 399G169 Rev B 27 April 2016
2.4
FreeSpeak II Base rear connectors
Control
Description
A
Power connector. Mains power lead with internal current
converter.
B
Power connector. DC wallwart power lead (Part # 453G032, 12V
DC, 60W). Use connector A or connector B or both to guard
against power failure.
C
Fiber connector to FS II splitter (Part # FSII-SPL). Used with Fiber
module (Part # HCI-SMFO or MMFO)
D
RJ45 connector to antenna (FSII-TCVR-19, FSII-TCVR-24) or
splitter.
E
DECT Sync. RJ45 connector to another Base Station. Can also be
used to synchronize to other Clear-Com DECT devices. In some
cases, you will need a cross-over cable instead of a standard
cable.
F
XLR Partyline connectors (standard microphone cable). Note: If
power is enabled on these ports the power operates across a pair
of ports, A and B, C and D.
Be sure to null the ports whenever cabling arrangements are
changed.
G
RJ45 connectors for 4-wire intercom. These ports can change pin
polarity according to whether they are connecting to a matrix or
another device.
H
XLR connector (standard microphone cable) for Program Feed
input, typically from a mixing console or audio player. Adjust
levels in Audio Settings/Program Input in the Base Station menus.
I
XLR connector (standard microphone cable) for Stage Announce
output.
Summary of Contents for FreeSpeak II
Page 31: ...Page 31 399G169 Rev B 27 April 2016 How to set cable length in the CCM 1 ...
Page 32: ...Page 32 399G169 Rev B 27 April 2016 How to set cable length from the Base menus ...
Page 65: ...Page 65 399G169 Rev B 27 April 2016 ...
Page 70: ...Page 70 399G169 Rev B 27 April 2016 Save settings from the CCM ...
Page 72: ...Page 72 399G169 Rev B 27 April 2016 Fix a Role in the CCM ...
Page 73: ...Page 73 399G169 Rev B 27 April 2016 Fix a Role from the Base menu screens ...
Page 80: ...Page 80 399G169 Rev B 27 April 2016 ...
Page 85: ...Page 85 399G169 Rev B 27 April 2016 How to program a Talk key to the Group ...
Page 89: ...Page 89 399G169 Rev B 27 April 2016 ...
Page 90: ...Page 90 399G169 Rev B 27 April 2016 Edit Beltpack Roles from the Base Station ...
Page 92: ...Page 92 399G169 Rev B 27 April 2016 Change Base Station key assignment from the Base Station ...