![CLEAN BURN CB-1400 Operator'S Manual Download Page 37](http://html.mh-extra.com/html/clean-burn/cb-1400/cb-1400_operators-manual_2619992037.webp)
Operator's Manual: Model CB-1400
4-9
Figure 4G - Vertical Mounting of the Metering Pump
Installing the Metering Pump
Preparing for Installation
Before starting installation of the metering pump, review Figure 4G, 4H, and 4I to become familiar with the
metering pump components. You will also need to accomplish the following activities:
•
Verify that you have the proper metering pump for your furnace model.
•
Gather all required tools and materials as needed for installation; as indicated in the
following procedures, some materials (e.g. fittings, tubing) are to be user-supplied.
•
Standard mounting
is vertical mounting on a wall;
this pump installation is recommended.
Alternate mounting
is horizontal mounting on a bracket. Be sure to carefully follow the
appropriate procedures/diagrams for pump mounting.
•
For optimal metering pump functioning,
ensure that the pump is mounted at a distance not
more than four (4) feet from the oil tank.
Standard Mounting: Vertical Positioning
1.
Refer to Figures 4G, 4H, and 4I. Note that the metering pump is shipped with the pump head
already positioned for vertical wall mounting.
2.
Use the appropriate type of bolts and washers (user-supplied) to securely mount the metering
pump to the appropriate wall in your building
at a distance not more than four feet from the tank.
Summary of Contents for CB-1400
Page 2: ......
Page 8: ......
Page 18: ...Operator sManual ModelCB 1400 1 10 ...
Page 62: ...Operator sManual ModelCB 1400 5 8 ...
Page 68: ...Operator sManual ModelCB 1400 7 2 ...
Page 84: ...Operator sManual ModelCB 1400 9 10 ...
Page 92: ...Operator sManual ModelCB 1400 10 8 ...
Page 108: ...Operator sManual ModelCB 1400 C 2 ...