Operator's Manual: Models CB-1750, CB-2500 & CB-3250
3-1
SECTION 3: FURNACE ASSEMBLY
Understanding Assembly
Assembling your Clean Burn Furnace includes the following steps:
(1) Installing the Blower Assembly
(2) Installing the Hot Air Discharge Components
(3) Installing the Energy Retention Disc
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
Clean Burn recommends that you review all assembly procedures before proceeding, paying careful
attention to safety information statements.
Figure 3A
on the following page provides a general overview of the furnace components and their
proper assembly.
Required Tools and Materials
The following tools are required for furnace assembly and should be gathered before starting any
procedures:
• 9/16" open-end wrench
• Medium flat-blade screwdriver
• Medium adjustable wrench
• 1/4" nut driver attachment for drill
• 5/16" nut driver attachment for drill
• Variable speed drill
Summary of Contents for CB 140
Page 2: ......
Page 8: ...TABLE OF CONTENTS APPENDIX C Furnace Service Record C 1 ...
Page 40: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 3 20 ...
Page 72: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 5 6 ...
Page 80: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 7 4 ...
Page 96: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 9 10 ...
Page 104: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 10 8 ...
Page 128: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 A 24 ...
Page 142: ...Operator s Manual Models CB 1750 CB 2500 CB 3250 C 2 ...