![Claydon HYBRID M3 Operator'S Manual Download Page 60](http://html.mh-extra.com/html/claydon/hybrid-m3/hybrid-m3_operators-manual_2619778060.webp)
I
CARE AND MAINTENANCE
60
OPERATORS MANUAL - HYBRID - M3, M4, M4R, M4.8 & M6
To change the front tine, simply remove the lynch pin and remove the 19mm pin, slide the entire tine out and
replace the entire tine with a new one. Refit pin and lynch pin.
When new, the steel of the tine protrudes beyond the Tungsten, this is to protect the Tungsten when
transporting new drills. After use the drill should be placed on wooden boards to protect the Tungsten.
Great care needs to be taken when lowering the drills onto hard surfaces.
CHANGING WEARING PARTS
IMPORTANT
IF WORK IS REQUIRED TO BE CARRIED OUT WHILST
THE DRILL IS RAISED, ENSURE A SUBSTANTIAL PROP IS
POSITIONED SAFELY UNDER THE DRILL PREVENTING
IT FALLING UNDER ITS OWN WEIGHT.
!
!
CHANGING LEADING TINE
Summary of Contents for HYBRID M3
Page 4: ......
Page 6: ......
Page 8: ......
Page 14: ...E SAFETY 14 OPERATORS MANUAL HYBRID M3 M4 M4R M4 8 M6 Decal Location ...
Page 65: ...65 I CARE AND MAINTENANCE OPERATORS MANUAL HYBRID M3 M4 M4R M4 8 M6 PAGE LEFT BLANK ...