F I L O X S e r i e s F i l t e r
Installation Operation Maintenance Manual
FILOX WS ISS 1 \page 14
7.0
COMMISSIONING
7.1
INTRODUCTION
It is recommended that the commissioning of the plant is undertaken by a
trained service engineer, who will be able to put the plant into service quickly,
and most efficiently. However, if the services of an experienced engineer are
not available, following the steps outlined below will result in the system being
properly commissioned.
7.2
Setting the Time of Day
1. Press SET CLOCK
2. Adjust hours with UP and
DOWN arrows
3.
Press NEXT
4.
Adjust minutes with UP
and DOWN arrows.
5. Press NEXT to return to
normal operation
The filter regeneration cycles have been factory programed.
The time of day for regeneration to take place has been entered as 2.00 AM
and this can be altered depending on site requirements.