background image

ASTRA® VR Endovaginal/Endorectal Probe Reprocessor  

Installation Manual 

M0065_C 

    

 

 

 

 1

 

 

 

 

ASTRA® VR 

1.

 

INSTALLATION MANUAL  

This instruction manual contains important information to install this device safely and 

effectively. Review this manual before installation.  Keep this manual in a safe and accessible 

location. Before beginning this installation, make certain that you have read and understood 

these instructions.  

 

It is the installer’s responsibility to ensure the equipment is installed in a manner which 

conforms to any state/local building code requirements. This installation requires that 

appropriate plumbing and electrical supplies are present before connecting the ASTRA VR 

system.  Installing the ASTRA VR system does not require specialized training. Contact CIVCO 

Medical Solutions with any questions or comments regarding the information contained in this 

manual at (800) 445-6741 or via email at [email protected]

 

2.

 

WARNINGS & CAUTIONS

 

 

CAUTION:

 

 

Read the entire manual before using the device. 

 

No user serviceable parts inside. Shock hazard may be present behind access panel. 

Panel removal should be performed only by qualified service personnel. 

 

The device weight exceeds 50lbs (22.7kg). When lifting loads heavier than 50 

pounds, use two or more people to lift the load. 

 

Do not use this system until it has been properly installed.

  

 

Use the device only for the intended use as described in this manual. 

 

Explosion hazard – do not use in the vicinity of flammable gases or liquids. 

 

Do not operate the device if it is not working properly or if any part of the device 

has been dropped or damaged. 

 

For use only with CIVCO Medical Solutions approved high-level disinfectants. 

 

Connect the system to a hospital grade GFCI receptacle only. GFCI outlet must be 

tested on a regular basis per the GFCI manufacturer’s recommendation. 

 

Do not operate system if fluid leakage is present, contact CIVCO Medical Solutions. 

 

The device is pre-programmed for use with a specific High-Level Disinfectant (HLD), 

determined by the user. 

 

Failure to properly lock the quick connect connectors into place may result in leaks. 

 

Use of power cords, drain and water inlet hoses and connectors not supplied by 

CIVCO Medical Solutions may affect the safety and performance of this device. 

 

Do not use abrasive cleaning materials, solvents, or alcohol to clean the device.  

 

Do not pour any items directly into disinfection chamber. 

 

Do not use this device for any purpose other than its intended use. 

          

 

CAUTION: Hot Surface

 

 

 

When cabinet door is opened, use caution when removing and installing HLD 

bottles. The HLD warmer plate surface temperature may reach 161°F (72°C). 

 

 

Summary of Contents for Astra VR

Page 1: ... registered trademark of CIVCO Medical Solutions All other trademarks are property of their respective owners Printed in the USA CIVCO Medical Solutions 102 First Street South Kalona IA 52247 USA WWW CIVCO COM Sales info civco com Customer Service info civco com Technical Support service civco com Phone 800 445 6741 ...

Page 2: ...eavier than 50 pounds use two or more people to lift the load Do not use this system until it has been properly installed Use the device only for the intended use as described in this manual Explosion hazard do not use in the vicinity of flammable gases or liquids Do not operate the device if it is not working properly or if any part of the device has been dropped or damaged For use only with CIVC...

Page 3: ...m is required Incoming water pressure 30 50 psi 207 345 kPa Recommended minimum flow rate 1 gpm 3 8 lpm at 30 psi 207 kPa Temperature Cold water supply 50 80 F 10 27 C Drain Requirements A drain connection is required using supplied tubing the device may drain directly into an existing sink dishwasher drain tailpiece or connected permanently to existing plumbing drain Environmental Requirements In...

Page 4: ...embly Small 610 2000 1 HLD Bottle Cap Assembly Large 610 2306 1 Power Cord A7061 01 1 Probe Connector Holder A1064 01 2 Probe Connector Holder Pad back A9064 01 2 Probe Connector Holder Pad base A9065 01 2 EZ Anchor Kit A6164 01 6 Wall Bracket A1053 01 1 Water Supply and Drain Tubing Assembly A0304 01 1 Operators Manual M0066 1 Installation Manual this document M0065 1 ASTRA VR Quick Start Guide 5...

Page 5: ...et Failure to follow these installation instructions may affect the operation and effectiveness of this device Figure 1 below shows a typical installation Figure 1 Typical ASTRA VR Installation The on off switch power cord vent water supply and drain are located on the right side facing of the device These connections may be routed behind the unit if your plumbing or electrical outlet is located t...

Page 6: ...r inlet hoses and connectors and a 10 ft removable hospital grade power cord Use of the supplied power cord is required to maintain proper grounding and safe operation of the device This power cord is required to be plugged directly into a GFCI receptacle Figure 2 Mounting hole locations and overall space requirements indicated by dotted lines ...

Page 7: ...t the load C Mounting Probe Connector Holders Two probe connector holders A1064 01 are supplied with the device and should be installed on the left side of the unit refer to Figure 2 for mounting locations Install probe connector holders with the EZ Anchor kit A6164 01 supplied Once mounted to the wall attach probe connector holder pads back A9064 01 and base A9065 01 in each holder D Plumbing Ins...

Page 8: ...ste drain This can be into a typical dishwasher type tailpiece under a sink a floor standpipe or directly into a waste sink secure line to prevent drain water from splashing Ensure any required air gaps are maintained Figure 4 Drain and water quick disconnect fittings E Electrical Connection It is the installer s responsibility to ensure the device is installed in a manner which is compliant with ...

Page 9: ...ting and stop valve within 8 ft o Water supply pressure within 30 50 psi o Water supply flow rate greater than 1 gpm o Water supply temperature within 50 80 F Drain available within 8 ft Physical Mounting bracket and probe holders installed Minimum clearance requirements met Environmental Environmental requirements met Site Photograph Photograph attached of intended installation site Other All par...

Reviews: