Page 17
Piping Recommendations
1. Trap each dryer individually. Always keep the trap clean
and in good working condition.
2. When dryer is on the end of a line of equipment, extend
header at least 4 feet (1.22 m) beyond dryer. Install globe
valve, union, check valve and by-pass trap at end of line. If
gravity return to boiler, omit trap.
3. Insulate steam supply and return line for safety of operator
and safety while servicing dryer.
4. Keep dryer in good working condition. Repair or replace any
worn or defective parts.
1. Keep steam coils clean.
2. Check periodically and clean as often as required.
3. Remove lint and dirt accumulation from coil fins periodically
as dirty lint-laden coil fins decrease the efficiency of steam-
heated dryers.
PIPING
RECOMMENDATIONS
STEAM HEATING
UNITS
Summary of Contents for L28UR30E
Page 10: ...Page 10 L28UR30 Outline Dimensions Gas Steam and Electric Models...
Page 11: ...Page 11 L28US30 Outline Dimensions Gas Model...
Page 23: ...Page 23 Steam Piping Installation Illustration...
Page 40: ...Page 40 DIRECTSPARK IGNITIONOPERATION FLOW CHART...
Page 49: ...Page 49 30 lb Dryer Front View Illustration...
Page 51: ...Page 51 30 lb Dryer Rear View Illustration...
Page 64: ...Page 64...