3-37
Cisco UCS C240 M4 Server Installation and Service Guide
OL-32474-01
Chapter 3 Maintaining the Server
Installing or Replacing Server Components
Caution
When installing the card to the bracket, be careful so that you do not scrape and damage electronic
components on the underside of the card on features of the bracket. Also avoid scraping the card when
you install the bracket to the pegs on the chassis wall.
a.
Set the new card on the metal bracket, aligned so that the thumbscrews on the card enter the threaded
standoffs on the bracket. Tighten the thumbscrews to secure the card to the bracket.
b.
Align the two slots on the back of the bracket with the two pegs on the chassis wall.
The two slots on the bracket must slide down over the pegs at the same time that you push the card
into the motherboard socket.
c.
Gently press down on both top corners of the metal bracket to seat the card into the socket on the
motherboard.
d.
Connect the supercap power module cable to its connector on the TMM, if present.
e.
Connect the single data cable to the card.
Step 6
Replace the top cover.
Step 7
Replace the server in the rack, replace cables, and then power on the server by pressing the Power button.
Figure 3-19
Modular RAID Controller Card Location
1
Thumbscrews on card
2
Cisco modular RAID controller bracket
352961
F
A
N 05
FA
N
0
4
FA
N
0
3
F
A
N 02
FA
N
0
1
CPU
1
CPU 2
SD1
SD2
Riser 2
Riser 1
2
1
Summary of Contents for UCS C240 M4
Page 8: ...Contents viii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 12: ...xii Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 14: ...xiv Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 16: ...xvi Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 ...
Page 26: ...1 10 Cisco UCS C240 M4 Server Installation and Service Guide OL 32474 01 Chapter 1 Overview ...