27
OL-23393-01
Figure 1-19
Assembling the Center, Left and Right Kick Guard Subassemblies
Assembling the Left Frame
This section describes the procedures you perform to assemble the left frame and includes the following
topics:
•
Required Parts and Tools, page 27
•
Assembling the Left Frame, page 28
Required Parts and Tools
•
1 left sub-assembly
•
1 left center sub-assembly
•
1 Left Screen center Bracket Sub-Assembly
•
5
M4 x 12 Pan Head Phillip Screw
•
1 #2 Phillips screwdriver