Prepare Your Location
This section illustrates how the building that houses the chassis must be properly grounded to the earth ground.
(See
Prepare Your Location , on page 7
.)
Figure 2: Building with Rack Room Connected to Earth Ground
Hardware Installation Guide for Cisco NCS 5500 Series Fixed-Port Routers
7
Prepare for Installation
Prepare Your Location