![Cisco cBR Series Hardware Installation Manual Download Page 99](http://html.mh-extra.com/html/cisco/cbr-series/cbr-series_hardware-installation-manual_63737099.webp)
Figure 46: Closing the Ejector Levers on the Supervisor PIC
Step 6
Tighten the four captive screws using a 3/16" flat-blade torque screwdriver with a torque of 6-8 in-lb (0.68-0.90 Nm) to
secure the PIC.
What to do next
• If you are using a single Supervisor PIC,
install a blank PIC for the Supervisor
in the empty slot.
•
Install the Supervisor PIC cable management bracket
(recommended).
•
(if not already installed).
Installing the Supervisor PIC Cable Management Bracket
The Supervisor PIC cable management bracket is shipped separately in the chassis accessory kit. It has a
smaller slot for fiber-optic cables and a larger slot for the RJ-45 cables.
Before you begin
• Attach an ESD-preventive wrist strap to your wrist and connect the other end to the grounding lug
connected to the chassis.
•
(recommended).
Required Tools and Equipment
• ESD-preventive wrist strap
Cisco Converged Broadband Routers Hardware Installation Guide
91
Installing the Supervisor in the Cisco cBR Chassis
Installing the Supervisor PIC Cable Management Bracket