![Cisco cBR Series Hardware Installation Manual Download Page 151](http://html.mh-extra.com/html/cisco/cbr-series/cbr-series_hardware-installation-manual_63737151.webp)
Figure 99: Inserting the PIC
Step 5
Simultaneously pivot both the ejector levers towards each other until they cannot be pivoted any further.
Figure 100: Closing the Ejector Levers on the PIC
Step 6
Tighten the two captive screws using a 3/16" flat-blade torque screwdriver with a torque of 6-8 lb-in (0.68 Nm to 0.90
Nm) to secure the PIC.
Cisco Converged Broadband Routers Hardware Installation Guide
143
Installing the Interface Line and PIC Cards
Installing RF PIC in the Cisco cBR Chassis