Step 1
Step 2
.
Step 3
Remove all external cables.
Step 4
Loosen the screws inserted into the side cable management bracket using a #2 Phillips screwdriver.
Step 5
Loosen the screws inserted into the rack mount ear on each side using a #2 Phillips screwdriver.
Step 6
Remove the chassis from the rack.
What to do next
•
Move the equipment to another location
.
• To return the equipment to Cisco, pack the chassis in the original Cisco box that you received during
shipment and visit
website.
Cisco Converged Broadband Routers Hardware Installation Guide
186
Maintaining the Cisco cBR Chassis
Unmounting the Cisco cBR Chassis