Cisco 819 Integrated Services Router Hardware Installation Guide
OL-23125-02
Chapter 3 Connecting the Router
Verifying Connections
Step 2
Plug the adapter cord into the router.
Note
The power adapters have 18 AWG wires for the input connection. Tinned bare wires are used for
the input connection as there is no standard established for connector type. Screw terminal
blocks are most often used.
Verifying Connections
To verify that all devices are properly connected to the router, first turn on all the connected devices,
then check the LEDs. To verify router operation, refer to
Table 3-1
.
For full LED description, see
Table 1-5
.
1
Black wire (negative)
3
Adapter
2
White wire (positive)
Table 3-1
Verifying the Router Operation
Power and Link
LEDs to Check
Normal Patterns
SYS
Yellow
FPGA download is complete.
Green (blinking)
ROMMON is operational.
Off
After powering up, when FPGA is being downloaded (in
ROMMON).
ACT
Green
Network activity on FE Switch ports, GE WAN port, 3G
cellular interface, and serial interfaces.
Off
No network activity.
Summary of Contents for 819 series
Page 6: ...Contents 4 Cisco 819 Integrated Services Router Hardware Installation Guide OL 23125 02 ...
Page 11: ...9 Cisco 819 Integrated Services Router Hardware Installation Guide OL 23125 02 Preface ...
Page 13: ...11 Cisco 819 Integrated Services Router Hardware Installation Guide OL 23125 02 Preface ...
Page 18: ...16 Cisco 819 Integrated Services Router Hardware Installation Guide OL 23125 02 Preface ...