
Site
Requirements
Preventive
Site
Configuration
Maintaining
Normal
Operation
Planning
proper
location
for the router
and
the layout
of your
equipment
rack
or wiring
closet
are
essential
for
successful
system
operation
Equipment
placed
too
close together or inadequately
ventilated
can
cause
system
overtemperature
conditions
In
addition
chassis panels
made
inaccessible
by poor equipment
placement
can
make
system
maintenance
difficult
Following
are
precautions
that
can
help
avoid
problems
during
installation
and ongoing
operation
General
Precautions
Follow
these
general
precautions
when
planning
your
equipment
locations
and
connections
Use
the
show
environment
command
regularly
to
check
the
internal
system
status
The
environmental
monitor
continuously
checks
the
interior
chassis
environment
it
provides
warnings
for high temperature
and
maximum
and
minimum
voltages
and
creates reports
on any
occurrences
If
warning messages
are displayed
take
immediate
action
to
identify
the cause
and
correct
the
problem
Maintain
at
least
six
inches
of clearance
in
front
of
and
behind
the chassis
to
allow
cooling
air
to
flow
through
the
inlet
and
exhaust
ports
Keep
the chassis free
from
obstructions
and away from
the exhaust
air
of other
equipment
Remember
that
electrical
equipment
generates
heat and
ambient
room
temperature
alone
may
not be
adequate
to
cool
equipment
to
acceptable
operating
temperatures
Do
not place
the router
directly
on
the
floor
or
in
any
area
that
tends
to
collect
dust
Follow
ESD
prevention
procedures
to
avoid
damage
to
equipment
Damage
from
static
discharge
can
cause
immediate
or intermittent
equipment
failure
Ensure
that
the backplane
cover
interface
processors
and
any
blank
interface
processor
fillers
are
in
place
and
secure
The
fans
direct
cooling
air
throughout
the chassis interior
loose panel
or
empty
interface
processor
slot
can
redirect
the
air
flow
away
from
active
components
Also
the backplane
cover
shields
the high current present
on
the
backplane
and
must be
in
place
to
maintain
the
EMI
integrity
of the
system
Equipment-Rack
Ventilation
If
you
plan
to
install
the router
in
an
equipment
rack you
can
avoid
overtemperature
conditions
by
following
the guidelines
in
the section
Equipment Racks
in
this
chapter
in
addition
to
the
following
precautions
There must be
at
least
six
inches
of clearance
between
the front
and
rear of the chassis
Enclosed
racks
must have
adequate
ventilation
or an exhaust
fan
use
an
open
rack
whenever
possible
Equipment
near
the
bottom
of
rack
may
generate
excessive
heat
that
is
drawn
upward
and
into
the
inlet
ports
of
equipment
above
leading
to
overtemperature
conditions
in devices
at
or near
the top of the
rack
For
functional
description
of the environmental
monitor
and
the
status
levels
refer
to
the section
Environmental
Monitoring
and
Reporting
Functions
in the chapter
Product
Overview
Preparing
for
Installation
2-17
Summary of Contents for 7513 Series
Page 1: ......
Page 11: ...Cisco 7513 Hardware Installation and Maintenance ...
Page 121: ...Site Log 2 56 Cisco 7513 Hardware Installation and Maintenance ...
Page 162: ...Troubleshooting the Processor Subsystem 4 10 Cisco 7513 Hardware Installation and Maintenance ...
Page 266: ...Interface Processor LEDs B 16 Cisco 7513 Hardware Installation and Maintenance ...
Page 270: ...C 4 Cisco 7513 Hardware Installation and Maintenance ...
Page 288: ...18 Cisco 7513 Hardware Installation and Maintenance ...