12128-001
95-01
Page 18
15 Sept 2002
2
Working from center to aft then center to forward, apply tape to cover and press
down slightly on cover while setting tape so that top surface of cover is flush with
fuselage.
WARNING:
Ensure nominal bondline of 0.080 - 0.005 inch (2.03 - 0.13 mm)
3
Ensure adhesive is devoid of air pockets. Inspect bond line for voids or high spots.
Clean any adhesive that squeezes out.
(o)
Through access cover CB7, remove tape and plastic sheet. Inspect and clean enclosure
for any spilled adhesive or debris.
(p)
Utilizing Heated Air Cure methods, fully cure adhesive for 1 hour at 140° F (60° C). (Refer
to AMM 51-20)
(q)
Fill, seal, and paint CAPS cover enclosure. (Refer to AMM 53-30)
(r)
Install CAPS cover placard. (Refer to AMM 11-20)
Summary of Contents for CAPS
Page 2: ......
Page 4: ......
Page 11: ...12128 001 95 01 Page 3 Figure 95 011 CAPS System and Deployment 15 Sept 2002 ...
Page 13: ...12128 001 95 01 Page 5 Figure 95 012 CAPS Handle and Ignition System 15 Sept 2002 ...
Page 15: ...12128 001 95 01 Page 7 Figure 95 013 Incremental Bridle and Deployment Bag 15 Sept 2002 ...
Page 17: ...12128 001 95 01 Page 9 Figure 95 014 Parachute Assembly and Line Cutters 15 Sept 2002 ...
Page 18: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 27: ...12128 001 95 01 Page 19 Figure 95 016 CAPS Cover Installation 15 Sept 2002 ...
Page 30: ...12128 001 95 01 Page 22 Figure 95 017 CAPS Rocket Assembly Sheet 1 of 2 15 Sept 2002 ...
Page 31: ...12128 001 95 01 Page 23 Figure 95 017 CAPS Rocket Assembly Sheet 2 of 2 15 Sept 2002 ...
Page 37: ...12128 001 95 01 Page 29 Figure 95 018 CAPS Activation System 15 Sept 2002 ...
Page 38: ...12128 001 95 01 Page 30 Figure 95 019 Sheet 1 of 2 CAPS Test Fixture 15 Sept 2002 ...
Page 39: ...12128 001 95 01 Page 31 Figure 95 019 Sheet 2 of 2 CAPS Test Fixture 15 Sept 2002 ...