background image

3HPST-ENG • 01/16 • APS 4504

PO Box 4866

Spartanburg, SC 29305-4866

1-864-574-7966

www.hoke.com

[email protected] 

The HOKE

®

 Brand is just one product offering manufactured and supplied by 

CIRCOR Instrumentation, an ISO 9001:2008 registered facility headquartered 

in Spartanburg, SC, USA, a division of CIRCOR International (NYSE:CIR).

HOKE distributors are worldwide.

Contact us or visit our website to locate the nearest distributor to assure your 

projects are consistently implemented across the globe with the greatest 

Safety, Integrity and Reliability.

Our headquarters and manufacturing 

facilities are located at: 

405 Centura CT.

Spartanburg, SC 29303-6603 USA 

Summary of Contents for HOKE 3HPST

Page 1: ...Continuously Improving Flow Control HOKE 3HPST User Instructions Continuously Improving Flow Control...

Page 2: ...1 Connect hand pump to Pre Setting head The hand pump is supplied with a hose connected Therefore the free end needs to be connected to the Pre Setting head 1 1 Remove the hand pump and Pre Setting he...

Page 3: ...the System Bleeding process prior to using the tool and whenever any part of the hydraulic system has been disconnected 2 1 Position the hand pump at a higher elevation than the Pre Setting head this...

Page 4: ...p the Die and Jig as a matched pair and stored in the black case when not in use 3 1 Select the corresponding Die and Jig set to the desired tube size you wish to pre set Make sure the Die and Jig is...

Page 5: ...elease position screw the Indicator Nut on to the threaded piston shaft 5 Tube Preparation 5 1 Ensure the tube outside diameter wall thickness and hardness is within acceptable specifications Free fro...

Page 6: ...hand pump release valve turn clockwise 6 6 Pump the handle until the indicator arm releases CAUTION Stop pumping immediately after the arm releases as over pumping may cause the tube to swell and stic...

Page 7: ...The initial fitting make up is now complete 8 Dismantle Store Unit 8 1 Open the Hand pump release valve 8 2 Remove the Die and Jig from the Pre Setting head by first unscrewing the Die Fixing bolt us...

Page 8: ...ive plug removed and stored earlier 8 6 Store clean components and accessories in the black case 8 7 Lay the black case down horizontally when possible during storage PRE SETTING HEAD HAND PUMP HOSE H...

Page 9: ...with each other to create optimal driving force to seat the ferrules to the tube and create a leak tight connection The installation of used ttings and bodies may cause unintended leakage due to the...

Page 10: ...registered facility headquartered in Spartanburg SC USA a division of CIRCOR International NYSE CIR HOKE distributors are worldwide Contact us or visit our website to locate the nearest distributor t...

Reviews: