background image

9

Installation Appendix: Utilization of Used Fittings and Nuts

 

 

 

Fitting Manufacturing Warning

During the fi rst make-up of a fi tting the front ferrule is coined or seated with the fi tting body.  Coining is a 
cold working process where a moderate amount of force is applied from the front ferrule to the body causing 
slight plastic deformation which generates the sealing action of the ferrule and the body.  During subsequent 
remakes of the original body and ferrule; the ferrule re-seats and seals the connection to create a leak tight 
connection.  Therefore; if attempting to install a used fi tting body with new ferrules it may compromise the leak 
tight integrity of the fi tting since the body was previously coined.  Also, the nut and rear ferrule coin with each 
other to create optimal driving force to seat the ferrules to the tube and create a leak tight connection.  The 
installation of used fi ttings and bodies may cause unintended leakage due to the installation of used hardware; 
CIRCOR assumes no responsibility of the installation when used fi ttings are utilized, all warranties are voided.  
All responsibility and liability for leakage and product failure remains solely with the installer.
 

Fittings up to and Including ½”/12mm – All Alloys

When using previously installed nuts and fi ttings with new ferrule sets (sizes ≤ ½” / 12mm) , the ferrules must 
be set with new tubing using a manual pre-setting tool (PST).  Refer to the “Manual Installation” instructions 
above. 
 

Over ½” / 12mm –All Alloys

When using previously installed nuts and fi ttings with new ferrule sets / (sizes > than ½” / 12mm), the ferrules 
must be set with new tubing using the Hydraulic Pre-Setting Tool (HPST).  Refer to the “HPST Installation” 
instructions above.

Summary of Contents for HOKE 3HPST

Page 1: ...Continuously Improving Flow Control HOKE 3HPST User Instructions Continuously Improving Flow Control...

Page 2: ...1 Connect hand pump to Pre Setting head The hand pump is supplied with a hose connected Therefore the free end needs to be connected to the Pre Setting head 1 1 Remove the hand pump and Pre Setting he...

Page 3: ...the System Bleeding process prior to using the tool and whenever any part of the hydraulic system has been disconnected 2 1 Position the hand pump at a higher elevation than the Pre Setting head this...

Page 4: ...p the Die and Jig as a matched pair and stored in the black case when not in use 3 1 Select the corresponding Die and Jig set to the desired tube size you wish to pre set Make sure the Die and Jig is...

Page 5: ...elease position screw the Indicator Nut on to the threaded piston shaft 5 Tube Preparation 5 1 Ensure the tube outside diameter wall thickness and hardness is within acceptable specifications Free fro...

Page 6: ...hand pump release valve turn clockwise 6 6 Pump the handle until the indicator arm releases CAUTION Stop pumping immediately after the arm releases as over pumping may cause the tube to swell and stic...

Page 7: ...The initial fitting make up is now complete 8 Dismantle Store Unit 8 1 Open the Hand pump release valve 8 2 Remove the Die and Jig from the Pre Setting head by first unscrewing the Die Fixing bolt us...

Page 8: ...ive plug removed and stored earlier 8 6 Store clean components and accessories in the black case 8 7 Lay the black case down horizontally when possible during storage PRE SETTING HEAD HAND PUMP HOSE H...

Page 9: ...with each other to create optimal driving force to seat the ferrules to the tube and create a leak tight connection The installation of used ttings and bodies may cause unintended leakage due to the...

Page 10: ...registered facility headquartered in Spartanburg SC USA a division of CIRCOR International NYSE CIR HOKE distributors are worldwide Contact us or visit our website to locate the nearest distributor t...

Reviews: