03
This manual provides commissioning information about Wallbox eNext,
which has been designed and tested to allow electric vehicle charging,
specified in IEC 61851.
This document has different sections such as step-by-step installation
procedure and technical data.
ELECTRICAL RISK
Necessary precautions shall be taken to prevent any electrical
risk while the operations are carried out within the unit.
Unit must be disconnected from any power source during
commissioning.
ATTENTION!
Indicates that damage to property can occur if appropriate
precautions are not taken.
So, hello!
THE FOLLOWING SYMBOLS ARE USED FOR IMPORTANT
SAFETY INFORMATION IN THIS DOCUMENT
•
Complies with IEC 61851, Electric vehicle conductive
charging system (IEC 61851-1:2017).
•
Complies with IEC 62196, Plugs, socket-outlets, vehicle
couplers and vehicle inlets (IEC 62196-1 and IEC 62196-2).
•
Standards: 2014/35/UE, LVD;2014/30/UE, EMC.
Summary of Contents for Wallbox eNext S
Page 1: ...Installation Manual Wallbox eNext Series ...
Page 2: ...Wallbox eNext Series Installation Manual ...
Page 4: ...Wallbox eNext Series Installation Manual ...
Page 6: ...02 Wallbox eNext Series Installation Manual 1 ...
Page 11: ...07 ...
Page 14: ...10 Wallbox eNext Series Installation Manual 4 Dimensions in mm 39 335 315 200 335 ...
Page 19: ...15 C Positioning Drill the wall Drill bit M 6 8 Dimensions in mm 1100 255 230 115 ...
Page 30: ...26 Wallbox eNext Series Installation Manual 7 ...