22
Wallbox eNext Series Installation Manual
Closing
J
C l o s e t h e C h a r g e P o i n t a s p e r t h e f o l l o w i n g s t e p s o f v e r i f i c a t i o n a n d o p e r a t i o n .
1 — P OW E R I N P U T
Before proceeding, make sure voltage is present in the terminal blocks.
For Three-Phase models pay special attention to Neutral Cable.
2 — CA R E F U L W I T H T H E W I R E S
Before closing the unit, keep in mind that all cables should remain inside.
3 — C H E C K T H E P LU G S
Plugs should be in good condition before starting the unit.
4 — E L E C T R I CA L P R OT E C T I O N S
If the unit includes electrical protections, rearm all of them.
5 — C LO S I N G
Place the sealing washers on the screws and then place both in the Charge Point to close it.
Do not thight the screws yet.
6 — C H E C K T H E B E AC O N L I G H T S
All beacon lights should light properly. Here’s the reference:
7 — O P E R AT I O N
Check that no abnormal noise appears while the unit is charging.
P LU G S TAT E
A v a i l a b l e
C h a r g i n g
F a u l t
B E AC O N S C O LO U R
G r e e n
B l u e
R e d
Summary of Contents for Wallbox eNext S
Page 1: ...Installation Manual Wallbox eNext Series ...
Page 2: ...Wallbox eNext Series Installation Manual ...
Page 4: ...Wallbox eNext Series Installation Manual ...
Page 6: ...02 Wallbox eNext Series Installation Manual 1 ...
Page 11: ...07 ...
Page 14: ...10 Wallbox eNext Series Installation Manual 4 Dimensions in mm 39 335 315 200 335 ...
Page 19: ...15 C Positioning Drill the wall Drill bit M 6 8 Dimensions in mm 1100 255 230 115 ...
Page 30: ...26 Wallbox eNext Series Installation Manual 7 ...