Mastic Dispensing Operation
4) Set Rotary Switch on
Mastic Control Panel
to “
OFF
” and the
Rock Burner toggle
switch to
“On”
Allow Rock Burner to preheat for a minimum of
45 minutes
5) Set
Sealant Flow Control
to ‘5’
6) Set
Rock Flow Control
to ‘9’
7) Set Rotary Switch
on Mastic Control
Panel to “
MASTIC
”
8)
OPEN
the Mastic Gate to
begin mixing and dispensing
Note: Machine is configured to prioritize the mastic mixing chamber, wand will not operate
while the mastic system is in operation.
The Sealant Flow Control is
located below the
MAIN CONTROL PANEL
The Rock Flow Control is
located below the
MASTIC CONTROL PANEL
NOTICE
9)
CLOSE
the Mastic Gate
to stop dispensing
Note: Instructions will provide a 2:1 Rock to Sealant Mixing Ratio, for alternative mixing
ratios see Mixing Chart on last page of the instruction manual.
1
2
3
Wait until all 3 lights
on the Main Control
Panel are green
before continuing to
Step 5
Summary of Contents for C1
Page 13: ...13 Sub Control Panel Controls and Their Functions 1 2 3 4 5 6 7 8 9 10 11 12 IMLINE ...
Page 31: ...31 Sealant Control Panel Wiring Diagram ...
Page 37: ...37 Tank Burner Internal Wiring Diagram ...
Page 39: ...39 Hydraulic Schematic For Compressor Hydraulics see Supplement manual ...
Page 45: ...45 Sealant Plumbing Components ...
Page 50: ...50 Mastic Mixer Assembly ...
Page 55: ...55 Miscellaneous Parts ...