7.2 - FAN MOTOR ASSEMBLY
Check and retighten the electrical connections once a year.
Removing the fan
Open the door as explained above,
Unlock the 4 x M8 screws using the ratchet wrench and its extension,
Disconnect the motor's electrical connections,
Remove the fan via the access door.
Example: Floway "Classic PHE"
7.3 - HEAT RECOVERY UNIT
Plate heat exchanger ("Ceiling PHE", "Vertical PHE" and "Classic PHE" models)
Schedule annual dust removal / degreasing and maintenance of the bypass damper.
It is important to remember to clean and degrease the condensate drain pan using water and non-abrasive detergents:
The heat recovery unit on the "Vertical PHE" model is accessible via the door and can be removed by the sliding runner.
Rotary heat exchangers (“Classic RHE/RHE-Z” model)
Check the maximum and minimum rotation speeds once a year.
When stationary, the rotary heat exchangers accumulate dust and moisture
at their lowest point. Schedule cleaning during prolonged stoppages.
Check the permanently lubricated bearings once a year.
Heat recovery unit drive unit consumption
Sizes
1000
2000
3000
4000
5000
6000
7500
10 000
15 000
Variable speed
Max. power (W)
110
110
110
110
110
110
240
240
240
Voltage (V)
1 x 230 V
7.4 - ELECTRICS BOX
Retighten the connections twice a year.
Visually inspect the components, wires and cables.
7 - MAINTENANCE/SERVICE INTERVALS
FLOWAY EN-34