
HIPOT Tester 19071/19072/19073 User’s Manual
2-22
(2) Set “END OF STEP” to ON
Timing diagram – take an example by two test steps
Time
Limit
Description
T1
> 20mS
The time of external trigger signal (/START) to be remained
which needs larger than 20mS.
T2
< 200mS
The time of external trigger signal /START to /UNDER TEST
signal to be cleared, it will be smaller than 200mS. The
previous STEP test result /PASS signal status has been cleared
in advance.
< 300mS
The time of external trigger signal /START to /UNDER TEST
signal to be cleared, it will be smaller than 300mS. The
previous STEP test result /PASS signal status hasn’t been
cleared in advance.
T3
-
Test needed time of various test steps.
T4
> 5mS
/Pass signal sent larger than 5mS, /UNDER TEST signal is end.
T5
-
The equipment used time as testing, the signal is simultaneous
with Danger lamp on panel.
T6
>10mS
When the setting of “END OF STEP” is ON, /UNDER TEST
signal OFF time is larger than 10mS between STEP and STEP.
/START
T1
/UNDER TEST
T2
/FAIL
T3
/PASS
T4
T3
STEP 1
STEP 2
T6
T5