The AC supply is routed to the terminal block through an appropriate strain relief mounted on
this knockout plate.
2. To open the AC input area of the projector, remove the four screws holding the cover and
swing the cover downwards to open it.
3. Taking the approved line cord for your location, strip the cable jacket to expose a 100 mm
length of the bundled wires.
4. Cut the Line (black or brown) and Neutral (white or blue) wires to shorten them to a length
between 60 to 70 mm.
5. Using a wire stripper, strip the insulation from each individual wire to expose 10 mm of bare
wire on the end.
6. Pass the wires through the strain relief on the knockout plate and through the AC input cover.
7. Fasten the bare end of the wires into the Ground (G), Line (L), and Neutral (N) terminal block
connectors, starting first with the Ground (green) connection, followed by the Line (black or
brown) and Neutral (white or blue) connections.
Installing and setting up
Cinema 2K-RGB Installation and Setup Guide–CP2415-RGB and CP2420-RGB
21
020-103259-01 Rev. 1 (10-2022)
Copyright
©
2022 Christie Digital Systems USA, Inc. All rights reserved.
If printed, please recycle this document after use.