2-2
CP2000-XB Setup Guide
020-100250-02 Rev. 1 (06-2009)
Section 2: Installation & Setup
STEP 5 - Connect to Lamp Ballast and Power
1) Connect all 4 cables to the projection head prior to turning the ballast
breaker on. 2) Follow all labeling exactly.
HEAD-TO-BALLAST:
Connect all 4 ballast cables—two DC power
cables and two communication/control cables—between the projector
rear and lamp ballast. See
Figure 2-3
.
BALLAST-TO-AC:
Connect the ballast’s integral line cord to your AC
supply (you may have to first modify the plug for the AC at your site).
See
Figure 2-4
.
NOTE
:
Before connecting the ballast to AC, a qualified
electrical technician must make sure the ballast’s plug type and
Input
Power Range Switch
match the line voltage available at the site. Remove
the lamp ballast cover to access the switch and determine its
setting—toggle
left
for
200 VAC
supplies, toggle
right
for
400 VAC
supplies (factory default=200 VAC). Modify the plug type as
necessary—as a delta load with safety ground, it has no neutral.
Confirm that the ballast’s 3-phase status lights are on and that the adjacent
voltmeter displays an acceptable AC level for your ballast and region.
Then set the ballast AC ON/OFF switch to ON and listen for the internal
cooling fan start-up.
NOTE
:
There is no other indication of ballast ON
status.
Figure 2-3 Connect Head
to Ballast
Figure 2-4 Ballast Connection
Summary of Contents for CP2000-XB
Page 1: ...CP2000 XB S E T U P G U I D E 020 100250 02...
Page 2: ......
Page 40: ......
Page 52: ......
Page 66: ......