Section 2: Installation & Setup
CP2000-XB Setup Guide
2-3
020-100250-02 Rev. 1 (06-2009)
HEAD-TO-AC:
Connect the Christie-supplied IEC 320
(220V) 15-amp line cord to a single phase 208V AC
supply. Do not substitute other cords. Input power required
is 200 - 240 VAC (±10%), 50 to 60 Hz @ 3 amps for 208 V.
Warning!
Do not attempt operation if the AC level is not
within the specified voltage and power range for the
projection head (180-265 AC).
EXTRACTOR:
Also plug the extractor fan into the
projector. Refer to
Section 2.4 Installing a Lens, Lamp and
Cooling
.
At this point, the projection head is ready for use:
• The voltmeter should display the incoming voltage
•
PROJ. STATUS
light should be green
• Light engine compartment fans near the front should be
running
• Remainder of projection head will be off
STEP 6 - Set Lamp Type and Cable Length
NOTE
:
Service/installer required.
Explosion hazard. Keep the projection head OFF until you have defined
which lamp type is installed.
SET THE LAMP TYPE:
Before powering up the projector and
igniting the lamp, the installer must define in projector memory the
size of lamp installed, otherwise you risk severely overdriving or
underdriving a lamp.
At the TPC, go to the
Admin: Lamp
menu (password required).
Enter the size of the lamp currently installed in the projector
(factory default = 2.0 kW). Refer to
Section 3 Basic Operation
if
you need help using the TPC menus. Also record the lamp type on
the Lamp Installed label.
SET THE CABLE LENGTH:
Still in the
Admin: Lamp
menu,
use the
Cable Length (m)
text box to record the length of high-
voltage DC cables connected between your lamp ballast and
projection head. This value regulates the voltage drop that occurs over distance, and ensures that adequate
voltage reaches the lamp. Particularly in projectors rented for temporary installations, the setting may have to
be changed from its last use. Adjustment range is 2-30m (6½-100 ft.) in 1m increments.
Figure 2-5 Connecting Projection Head to
AC Supply
Figure 2-6 Connecting Projection Head to
AC Supply
Figure 2-7 Cable Length
Main
Status
Custom
Advanced
Admin
About
Ballast Cable Length (m)
Save