NEXGEN50R InstallationRev2
Page
2
of
38
04/11/2022
TABLE OF CONTENTS
1.0 DESCRIPTION
3
1.1
General
Information 3
1.2
Principals
of
Operation
4
1.3 Specifications,
Certifications, and Sizing Guidelines
5
2.0 INSTALLATION
7
2.1
Unpacking
7
2.2
Storage
7
2.3
Safety
Considerations
7
2.4
Plan
Ahead
9
2.5
Additional Parts Required for
Installation
9
2.6
Power
Supply
Electrical
Connections
10
2.7
Bonding
10
2.8
Plumbing
Connections
11
2.9
Saturated
Salt
Feeder
Installation
13
2.10
Plumbing
the
Overflow
14
2.11 Preparing the pH Neutral System
15
2.12
Plumbing
the
Hydrogen
Vent
15
3.0 OPERATION
16
3.1
Start-up
Procedures
and
Checks 16
3.2
Adjusting
Chlorine
Output 16
3.3
Touch-screen
Icon
Explanations 17
3.4
Using
the
Touchscreen
18
4.0 MAINTENANCE
25
4.1
Routine
Maintenance
25
4.2
Cell
Cleaning
Procedure
25
5.0
WARRANTY
INFORMATION
38
Note: This manual is subject to change at any time based on system improvements,
design changes, authorized modifications or new information. Please consult ChlorKing
for the latest revision.
Manufacturer:
ChlorKing Inc
2935 Northeast Parkway
Atlanta, GA 30360
1-800-536-8180