NEXGEN50R InstallationRev2
Page
30
of
38
04/11/2022
STEP 7
– Close both Gray Acid Wash Valves on the Acid Wash assembly.
Press NEXT to continue.
STEP 8
– Plug the Acid Wash Assembly into the Special Power Connector and turn on
the Acid Wash Pump on the skid.
Press NEXT to continue.
Close Gray
Acid Wash
Valve
Close Gray
Acid Wash
Valve