6. INSTALLATION
6.1 UNPACK THE DRYER
• The machine is attached to the pallet on several
points. Some parts of the machine have been
disassembled prior to shipment in order to avoid
accidental damage and reduce overall space
(indicator light, casters, inlet and outlet, etc).
Note that the dryers are fully assembled when
delivered inside the wooden cage. When delivered
on pallet, inlet/outlet and belt conveyor are detached
in a separate pallet.
• After the unloading operation, free all parts from the packaging. The tunnel and inlet/outlet are fixed
on the pallet with screws. All the auxillary parts (screws, belt conveyor, exhaust tube flage, etc..) are
placed inside the tunnel of each corresponding machine.
• Place the tunnel in the desired position. Unlock
the hoock on top of the roof to open all lateral
panels.
• Level the tunnel, check the 4 sides of the chassis
and regulate the adjustable feet accordingly. If
levelling is not successful, the conveyor belt will not
remain alligned correctly.
Summary of Contents for 1390052
Page 8: ...3 DRAWING ACE 950 ...
Page 9: ...3 DRAWING DUAL 1200 ...