TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
Installation Instructions
12
9.
Using levels, check the level and plumb of the housings
installed on the mounts and adjust as necessary following
information in the
Adjustments
section.
10. Connect housings following instructions included with LED
screens.
11. Install LED screens following instructions included with
screens.
Adjustments
Depth Adjust
The depth of each wall mount section is controlled by the
leveling feet.
1.
Using a level on the front of the housings in various places,
loosen or tighten the leveling feet adjust bolt (using a 1"
socket and T-handle driver) to assist in leveling the LED
housings across the various wall mounts until plumb. (See
Figure 18)
IMPORTANT ! :
It is best to make adjustments in small
increments to prevent any binding or torquing of the
mounts. Be sure to adjust the depth evenly for both sides
of the mounts.
CAUTION:
Over-torquing may cause damage. Do NOT
use a drill to make the depth adjustment.
Figure 18
2.
If a significant adjustment is required in order to level the
mounts, the fasteners installed in the
Adding Additional
Mounts
section may be removed to allow adjustment to one
mount without affecting the other mounts.
Leveling feet
locations
1
[LED housings not shown]