Installation Instructions
MSP-TEQ9
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
1/8" - wood stud
1/4" - concrete, brick
7/16"
1/2"
1/2"
5/32"
(included)
A (4)
1/4"
B (4)
[AF6 toggler]
C (4)
1/4-20 x 2-1/2"
E (1)
5/32"
F (2)
1/4-20 x 3/8"
D (2)
[Upright assembly]
K (1)
[Wall assembly]
L (2)
[Wall bracket cover]
M (2)
[Sliding cover]
S (2)
.4 x .255 x .0625
N (2)
[Adjustable leg]
G (4)
[Isolation washer]
H (4)
1/4-20 x 1"
J (4)
.500x.320x.425
P (2)
[Alternate foot]
T (10)
.75x.265x1.125
Q (8)
M4 x 08mm
R (10)
M6 x 40mm
[Knob]
V (2)
1/4"
U (2)
[AF6 toggler]
W (2)
1/4-20 x 2-1/2"
X (2)
1/4-20 x 1-3/4"
Y (2)
1/4-20
[not used]
[not used]
[not used]
[not used]
Z (2)
[Whiteboard
hanger bracket]
[not used]
[not used]
[not used]
AA (2)
M6 x 12mm