AN1 Series
Installation Instructions
8
Attaching Screen
1.
Hang screen assembly (R) onto wall bracket (S) using pre-installed bracket on back of screen assembly. (See Figure 5)
2.
Center screen assembly on wall bracket, matching pieces of tape on top of screen with edges of boom mount on wall bracket.
NOTE:
Notch in wall bracket (S) indicates center of screen. (See Figure 2)
Figure 5
Pre-installed
bracket
(S)
(R)
(View shown from behind
wall to which wall bracket
is attached)
1
1
Tape
locations
3.
Using screen brackets (P) as a template, locate studs, slide
bracket up under screen, and trace line under brackets at
locations on studs or on concrete wall. (See Figure 6)
NOTE:
Use 3 screen brackets (
minimum
of 2 brackets) along
bottom of screen, and locate brackets as close to outer
corners as possible. Remaining brackets may be used
along sides of screen, as desired.
Figure 6
4.
Lift and remove screen from wall bracket.
5.
Install screen brackets (P) using:
•
Wood/steel studs:
one #8-9 x 1-1/2" wood screw (L)
into
top
of each bracket slot and
slightly lower
than
marked location. (See Figure 6)
•
Concrete wall:
one #8-9 x 1-1/2" wood screw (L) into
top
of each bracket slot and
slightly lower
than
marked location, and into installed AF6 toggler. (See
Figure 6)
6.
Replace screen onto wall bracket.
7.
Slide screen brackets (P) up on wood screw and fasten to
screen frame using one #8 x 1/2" self-drilling screw (K) per
screen bracket (P). (See Figure 7)
Figure 7
4
4
3
3
3
(P)
(Wood or steel
stud installation
shown as example)
Lower frame
of screen
Mark location by
tracing line under
bracket
(K)
7
(P)
Bottom of
screen