AN1 Series
Installation Instructions
10
Installing Control Pad
1.
Remove top cover from control pad. (See Figure 11)
2.
Open lower cover on control pad. (See Figure 11)
3.
Insert control pad into control housing (U) by sliding it up
under tabs inside housing. (See Figure 11)
Figure 11
4.
Align holes in control pad with bosses in control housing
and push control pad into place. (See Figure 12)
5.
Secure control pad into place using two #4-24 x 1/4" Phillips
pan head screws (N). Do NOT over tighten. (See Figure 12)
6.
Attach all cables, including RF cable (AA), to control pad
following instructions included with projector/control pad.
IMPORTANT ! :
Connect cables BEFORE replacing control
pad cover.
7.
Use cable ties (F), as necessary, to secure the cables within
control panel. (See Figure 12)
8.
Replace top cover onto control pad. (See Figure 12)
Figure 12
9.
OPTIONAL:
The tab in the control panel assembly door
may be removed to allow attachment to the USB port. (See
Figure 12)
3
1
2
Top cover
Lower cover
(U)
Control
pad
Tabs
25
5
6
(N) x 2
7
Connect cables
BEFORE replacing
control pad cover.
Cable
tie
anchors
8
9
Tab
USB port
4
Bosses