
AN1 Series
Installation Instructions
12
Micro Adjustment
1.
If required, turn the micro adjust fastener
clockwise
to
extend projector further from wall. (See Figure 16)
2.
If required, turn the micro adjust fastener
counterclockwise
to retract projector closer to wall.
Figure 16
Attaching Marker Tray
1.
Attach marker tray (X) at any point along bottom of screen
frame using two #8 x 1/2" self-drilling screws (K). (See
Figure 17)
Figure 17
Attaching Valence
1.
Align right valence bracket (Z) along
outside
of right brace
on back of valence (BB), and fasten with two 10-24 x 3/8"
Phillips pan head machine screws (H). (See Figure 18)
2.
Align left valence bracket (Y) along
outside
of left brace on
back of valence (BB), and fasten with two 10-24 x 3/8"
Phillips pan head machine screws (H). (See Figure 18)
Figure 18
3.
Slide the valence (BB) with attached brackets into the boom
mount (V), sliding brackets under tabs in boom. (See
Figure 19)
4.
Adjust distance as required.
5.
Fasten through bracket slots into boom mount using four
10-24 x 1/2" Phillips pan head machine screws (Q). (See
Figure 19)
Figure 19
2
1
Extend
Retract
(X)
1
(K) x 2
(Z)
2
1
1
(H) x 2
2
Right brace
Left brace
(Y)
Bracket
placed on
outside edge
of brace
(BB)
3
(Q) x 4
5
(BB)
Tabs