Installation Instructions
AN1 Series
7
Installing Wall Bracket / Boom Projector Mount
1.
Install one fastener (See Table 1) into previously drilled
hole, leaving 1/2" of fastener extending from wall. (See
Figure 2)
Figure 2
2.
Hang wall bracket (S) onto fastener.
NOTE:
Notch in wall bracket (S) indicates center of screen.
(See Figure 2)
3.
Tighten fastener against wall bracket.
4.
Lower boom projector mount (V) onto wall bracket (S)
matching two fastener holes in upper arm with holes in
upper wall bracket. (See Figure 3)
5.
Align four fastener holes along bottom of boom projector
mount with four holes in wall bracket. (See Figure 3)
Figure 3
6.
Install and tighten two 10-24 x 3/8" Phillips cap head screws
(H) through upper arm of boom projector mount (V) into
vertical portion of wall bracket (S). (See Figure 4)
7.
Install and tighten four 10-24 x 3/8" Phillips flat head screws
(G) through wall bracket (S) into boom projector arm (V).
(See Figure 4)
8.
Determine location of studs behind drywall, and mark a
minimum of two locations for wall bracket attachment over
studs.
NOTE:
For concrete walls, mark at least two locations for
attachment a minimum of 16" apart AND within slots on
wall bracket (S).
9.
Drill one pilot hole (see Table 1 for size) at each location
marked in Step 8 (See Figure 4) and follow fastener
information (appropriate for wall type) located in Table 1.
NOTE:
Proceed to
Fastener Installation Methods
section at
end of Installation Instructions.
10. Fasten wall bracket assembly to wall using fasteners
appropriate to wall type (See Table 1). (See Figure 4)
Figure 4
1
x 1
(S)
Notch indicates
center of screen
3
(V)
(S)
5
4
7
(H) x 2
(G) x 4
(S)
(V)
8
x 2 (minimum)
6
9
10