Black plate (26,1)
Chevrolet Spark EV Owner Manual (GMNA-Localizing-U.S./Canada-
5853485) - 2014 - CRC - 4/2/13
5-26
Instruments and Controls
From the Edit Schedule screen,
select Summer/Winter or Yearly as
the preferred rate schedule.
Summer/Winter Schedule Start
Date Entering
With Summer/Winter as the
preferred rate schedule, from the
Edit Schedule screen press Edit
Summer Rate Schedule and the
press Edit next to the dates for the
summer rate schedule
1. Press Summer Start.
2. Press
y
or
z
to set the month
and day for the start of summer.
3. Press Winter Start.
4. Press
y
or
z
to set the month
and day for the start of winter.
Electric Rate Schedule Editing
From the Edit Schedule screen
press Edit Summer Rate Schedule,
Edit Winter Rate Schedule, or Edit
Yearly Rate Schedule.
1. Press the color bar for weekday
or weekend.
.
Weekdays are Monday
through Friday and use the
same rate schedule.
.
Weekends are Saturday
and Sunday and use the
same rate schedule.
Both weekday and
weekend schedules must
be set. The rate schedule
only applies for a 24-hour
period, starting at 12:00 AM
and ending at 12:00 AM.
There can be five rate
changes for each day; not
all must be used.