9
Fig.4
To change tool
1. Removing face mill or drill chuck arbor.
Loosen the arbor bolt at the top of the spindle shaft approximately 2 turns with a wrench.
Rap the top of the arbor bolt with a mallet.
After taper has been broken loose, holding chuck arbor on hand and turn detach the
arbor bolt with the other hand.
2. To install face mill or cutter arbor.
Insert cutter and cutter arbor into the taper of spindle. Tighten arbor bolt detach securely,
but do not over-tighten.
3. Removing taper drills.
a) Turn down the arbor bolt insert the taper drill into the spindle shaft.
b) Turn the rapid down handle rod down until the oblong hole in the rack sleeve
appears. Line up this hole with the hole in the spindle. Insert key punch key through
holes and strike lightly with a mallet. This will force the taper drill out.
Summary of Contents for Super Lux Mill
Page 10: ...10 Electric system ...
Page 12: ...12 ...
Page 14: ...14 BASE PARTS ...
Page 16: ...16 Column and support ...