background image

www.cglifesciences.com 

 

 

[email protected] 

PLEASE NOTE: FILTER REACTORS ARE FOR VACUUM/GRAVITY FILTRATION USE ONLY.

 

Read Entire Assembly Instructions Before You Begin. Familiarize Yourself with All of the Parts, 

and Pay Close Attention to All Notes and Highlights.

 

Support frames are shipped via common carrier and require loading dock access with a fork lift or 

jack. If you do not have a loading dock, then a lift gate-equipped truck must be requested at the 

time of order. 

 

For your convenience, the jacketed process filter reactor, the fully assembled reactor head, stirrer shaft 

& agitators, Tru-Stir™  stirrer shaft coupling,  PTFE stirrer bearing, temperature probe & adapter, S.S. 

inlet/outlet adapters, and motor are shipped assembled on the support frame. PTFE sleeves and keck 

clips are available separately. 

 

Unpack all of the parts and check against the packing slip to make sure you have received all 

necessary components. If possible, keep some of the packaging materials from the wood crates in 

case you need to return items for repair or replacement. 

 

Crate # 1: 

 

Unpack the support frame with reactor and components by removing the plastic electrical 

ties that hold the reactor in place and remove the cardboard/foam packing from around the 

reactor. Re-tighten all of the Allen screws with the supplied wrenches, adjust all black knobs 

and tighten torque knobs. The red silicone pad should be touching the straight section of the 

glass below the reactor flange. CHECK ALL ALLEN SCREWS BEFORE PROCEEDING; SCREWS CAN 

LOOSEN DURING SHIPMENT. 

 

Attach the Tru-Stir™ stirrer shaft coupling to the 1/4 HP electric stirrer motor. 

Crate # 2: 

 

Contains the 0-14mm drain valve, motor controller/temperature monitor and other 

miscellaneous parts. 

 

Move the reactor assembly and parts near the hood or area where the reactor will be used, but 

allow enough space to move freely around the support frame. During setup, preparation, and 

process, it is best to keep the wheels in their locked position by stepping down on the tab. 

 
 
 
 

 
 
 
 
 

 
 
 
 

 

Black Knobs 

for Vertical 

Height 

Adjustment 

Torque 

Knobs 

*PLEASE NOTE: 

Torque knobs should be 

checked periodically to 

ensure the torque function 

has not been adversely 

affected by corrosion. 

Summary of Contents for JACKETED FILTER

Page 1: ...IONS FOR JACKETED FILTER REACTOR SYSTEMS Support Frame with Oversized Rugged S S Uprights and Heavy Duty PTFE Coated Aluminum Fittings Mechanical Seal Stir Bearing PTFE Filter Base Open Frame Design f...

Page 2: ...rates in case you need to return items for repair or replacement Crate 1 Unpack the support frame with reactor and components by removing the plastic electrical ties that hold the reactor in place and...

Page 3: ...Klamp II 1ea CG 3498 03 90 Support Rod 1 The support frame has a universal motor mount It can be used with an vertical or horizontal electric air or optional explosion proof XP motor The mount automa...

Page 4: ...embly CG 2095 slides over the end of the shaft The height from the bottom will depend on the total volume you intend to run in the reactor 3 Once you have the upper agitator in place tighten the compr...

Page 5: ...it is pushed down on all edges evenly 5 Wrap the lower outlet adapters with NPT end with PTFE tape Thread the adapter into the filter base until it becomes snug DO NOT OVER TIGHTEN 6 Attach the beade...

Page 6: ...1 glass beaded pipe on the inlet outlet 2 Loosen the nut on the beaded pipe coupling Wet the PTFE Viton liner inside the coupling and attach one side to the 1 beaded pipe on the jacket 3 Insert the b...

Page 7: ...Assemble the stirrer shaft and agitators and lower into the reaction vessel 8 While lowering the reaction vessel lid onto the vessel carefully insert the end of the stirrer shaft through the 45 50 ce...

Page 8: ...www cglifesciences com technical service cglifesciences com...

Page 9: ...www cglifesciences com technical service cglifesciences com Optional Components Safety Shield Side Support Shelf Distillation Side Support Shelf Powder Addition Funnel Data Logger...

Page 10: ...mA or 10 V Zener barriers contain intrinsically safe circuits that are to be used to drive intrinsically safe field devices with hazardous area The manufacturer s data sheets must be consulted The re...

Reviews: