Classic IP Street Installation Manual
Rev. *60
9 of 27
C H A P T E R
2
I N S T A L L A T I O N O V E R V I E W
Overview
This chapter is an overview of the installation process:
1.
Requirements: Tool and part requirements for a typical installation.
2.
Installation Outline: Lists the basic installation steps in sequence.
Requirements
Tools
The following tools are required for Classic IP Street Antenna installations:
Arrow T-25 Staple Gun
Diagonal wire cutter
Hammer drill with 3/16” and 1/2” bits
Extension cord
Tape Measure
Hammer
Snap Off
Marker, Black Felt
Ratchet driver with 9/16” socket
Screwdrivers, mini, regular and #2 Phillips
Hacksaw
Utility knife
Wire Snake
Wire Strippers
Wrench, combination end 9/16”
Classic IP Street Installation Manual (This manual)
Tuning Procedure, TR4210 Checkpoint PN 7102103
Checkpoint Systems Field Service Diagnostic Management Software (DMS version
1.8.31 or later version) installed on a laptop with the appropriate cables. DMS is an