UN41-0077GF
UN41-0170LG
BABY TRIUM-DT/5
BABY TRIUM-DT/6
English language
Use and maintenance
14
INFORMATION CONCERNING HANDLING AND INSTALLATION
4
All the information for safe loading/unloading procedures is printed on the packing.
Unpacking and assembly
During unpacking, check that the components are in
good condition and tally with the number stated; in the
event of damage, report the damage to the retailer or
directly to the manufacturer within 8 days of receiving
the machine.
The packing materials must be appropriately disposed
of or recycled in accordance with the laws in force.
WARNING
The assembly of the work vehicle must be carried out
at an authorised service centre or at company facili-
ties equipped with appropriate equipment and suit-
ably trained personnel, in order to guarantee safety
during unpacking and installation.
Handling and lifting the packed unit
WARNING
Lift the packed machine using appropriate hoisting
means for the load to lift.
NOTICE
Check the parcel weight stated on the packing itself.
The illustration provides a rough outline of the work vehicle assembly divided into two units.
Summary of Contents for BABY TRIUM
Page 2: ......
Page 253: ...NOTE NOTES REMARQUES ANMERKUNGEN NOTAS ...
Page 254: ......
Page 255: ......