LIFTING
5.1-
Check that the lifting means, hooks, ropes, chains etc
….
have the
necessary capacity.
5.2
- Check that the unit carrier frame is detached (see detaching unit
carrier frame page 8).
5.3
-Check that the water barrels are completely empty.
5.4-
Fix hooks, ropes, chains etc
… “
A
” in the positions indicated in Fig.1 on
page 7 (to lift the towing frame with one barrel) and Fig.2 on page 7 (to lift
the towing frame with two barrels), marked with the graphic symbol
“HOOK”.
5.5-
Slowly start the lifting system and before lifting totally, check the
stability of the load and that there are no extraneous persons in the area.
5.6-
Keep a safe distance
and do not go, for any reason, in an area where
there is the risk of the machine falling.
WARNING! The lifting hook
“B” of the water barrels in Fig.1 and Fig.2 can only be
used to lift one water barrel and only when it is completely empty.
Fig.2
Fig.1
2
A
A
A
A
B
A
C
Summary of Contents for 998963
Page 4: ...4...
Page 5: ...5...
Page 7: ...7 Frame towed with one barrel Frame towed with two barrels...
Page 11: ...11 E Fig 3 2 Fig 4 2 G C B A E D E F C B A...
Page 19: ...19...
Page 20: ...20...