9 Warranty
Chase Building Supplies Pty Ltd (“Chase”) warrants that for a period of 7 years from the date of purchase that
Chase EPS External Wall Cladding System (the “Product”) will be free from defects due to defective manufacturing
workmanship or materials subject to compliance with the conditions below.
Nothing in this document shall exclude or modify any legal rights a customer may have under the Trade Practices Act
or otherwise which cannot be excluded or modified at law.
CONDITIONS OF WARRANTY
The warranty is strictly subject to the following
conditions:
1. This warranty is transferable;
2. The claimant must provide proof of purchase and
makes a written claim either within 30 days after the
defect would have become reasonably apparent or, if
the defect was reasonably apparent prior to installation,
then the claim must be made prior to installation;
3. The Product must be installed and maintained strictly
in accordance with the relevant Chase Specifications
current at the time of installation and must be installed
in conjunction with the components or products
specified in the specifications;
To obtain copies of such specifications, go to
www.chaseproducts.com.au
4. Coating and jointing systems, applied to or used
in conjunction with the Product must be applied or
installed and maintained strictly in accordance with the
relevant manufacturer’s instructions and good
trade practice;
5. The project must be designed and constructed in
strict compliance with all relevant provisions of the
current Building Code of Australia, regulations and
standards;
6. The claimant’s remedy for breach of warranty
is (at Chase’s option) that Chase will either supply
replacement product or rectify the affected product.
It expressly excludes the cost of labour for removal
and reapplication of the replacement Product. It also
excludes the cost of materials and coatings not covered
under this warranty that may be required to complete
the process;
7. Chase will not be liable for any losses or damages
(whether direct or indirect) including property damage
or personal injury, consequential loss, economic loss or
loss of profits, arising in contract or negligence or
howsoever arising. Without limiting the foregoing,
Chase will not be liable for any claims, damages or
defects arising from or in any way attributable to poor
workmanship, poor design or detailing, settlement or
structural movement and/or movement of materials
to which the Product is attached, incorrect design of
the structure, acts of God including but not limited to
earthquakes, cyclones, floods or other severe weather
conditions or unusual climatic conditions, efflorescence
or performance of paint/coatings applied to the
Product, normal wear and tear, growth of mould, mildew,
fungi, bacteria, or any organism on any Product surface
or Product (whether on the exposed or unexposed
surfaces);
8. All warranties, conditions, liabilities and obligations
other than those specified in this warranty are excluded
to the fullest extent allowed by law;
9. If meeting a claim under this warranty involves re-
coating of Products, there may be slight colour
differences between the original and replacement
products due to the effects of weathering and
variations in materials over time.
10 Disclaimer
Whilst every effort has been made to ensure the information in this manual is correct at the time of
printing, Chase Building Supplies Pty Ltd reserves the right to change the specifications of all products
referred to in this manual at any time. All changes made to this manual are uploaded on to our website
www.chaseproducts.com.au
Summary of Contents for CONCRETE FINISH
Page 4: ...2 1 Introduction...
Page 6: ...4 2 System Summary...
Page 9: ...7...
Page 10: ...8 3 National Construction Code NCC 2019...
Page 14: ...12 4 Materials...
Page 20: ...18 5 Specifications...
Page 22: ...20 6 Installation...
Page 29: ...27 Notes...
Page 30: ...28 7 Construction Details...