47
7.18 Downpipe Fixing
RENDER/MESH/TEXTURE
CHASE EPS PANEL
FIXING WASHER AND SCREW
NOTE: SCREWS TO BE MIN
25 MM DEPTH INTO STUD
DOWNPIPE WITH BRACKET
FIXED THROUGH TO
SUPPORT PLATE
ADDITIONAL
WALL INSULATION
AS SPECIFIED
BREATHABLE WALL WRAP
BACKING BLOCK
EXTERNAL FIXTURES
WALL LINING
Issue Description
Revisions
Notes
Drawing Number
Issue
Scale
Drawing Name
System Name
Date
1 : 5 @ A4
0
CP-024
TYPICAL DOWNPIPE FIXING DETAIL
FOR CAVITY SYSTEM
0
VERSION
P L A N
05-05-20
CHASE EPS PANEL
EXTERNAL WALL CLADDING SYSTEM
47
RENDER/MESH/TEXTURE
CHASE EPS PANEL
10 MM GAP AROUND PENETRATION
BREATHABLE WALL WRAP
WALL LINING
EXTERNAL ANGLE
FIXING WASHER AND SCREW
NOTE: SCREWS TO BE MIN
25 MM DEPTH INTO STUD
ADDITIONAL WALL INSULATION
AS SPECIFIED
SERVICE PIPE / PENETRATION
EXTERNAL ANGLE
FLASHING TAPE PLACED
AROUND PIPE OVER WALL WRAP
SEALANT (BY BUILDER)
SEALANT (BY BUILDER)
0
VERSION
04-06-18
RENDER/MESH/TEXTURE
CHASE EPS PANEL
FIXING WASHER AND SCREW
NOTE: SCREWS TO BE MIN
25 MM DEPTH INTO STUD
DOWNPIPE WITH BRACKET
FIXED THROUGH TO
SUPPORT PLATE
ADDITIONAL
WALL INSULATION
AS SPECIFIED
BREATHABLE WALL WRAP
BACKING BLOCK
EXTERNAL FIXTURES
WALL LINING
0
VERSION
04-06-18
7.18 Downpipe Fixing
TYPICAL DOWNPIPE FIXING DETAIL - DIRECT FIX
TYPICAL DOWNPIPE FIXING DETAIL - CAVITY SYSTEM
Summary of Contents for CONCRETE FINISH
Page 4: ...2 1 Introduction...
Page 6: ...4 2 System Summary...
Page 9: ...7...
Page 10: ...8 3 National Construction Code NCC 2019...
Page 14: ...12 4 Materials...
Page 20: ...18 5 Specifications...
Page 22: ...20 6 Installation...
Page 29: ...27 Notes...
Page 30: ...28 7 Construction Details...