Materials
It is recommended that when using the Chase EPS External Wall Cladding System
that Chase components be used in the application process of the system.
The substitution of any Chase EPS cladding or Chase system fixings (screws & washers) is not permitted on any
Chase EPS External Wall Cladding System application. All other components may be substituted with equivalent
alternatives that meet the specifications of the products used in this manual and the required building standards.
Failure to meet these requirements using any non-standard or non-approved component will void any product or
system warranty.
The following is a list of materials required to install the complete Chase EPS system:
1.
Breathable (Vapour Permeable) builders paper;
2.
Chase Flashing tape;
3.
For Cavity System - EPS, timber or steel
battens (depth between 15-40mm)
4.
Chase EPS cladding in selected thickness & size
(50, 75 & 100mm);
5.
Chase system fixings (screws & washers) in size
relevant to cladding (need screws a minimum
of 25mm longer than cladding thickness);
6.
Chase Starter channel in U-shape (boot) or
L-shape, aluminium/PVC (required where the
bottom edge of panel is unprotected). For BAL
29 Aluminium starter channels must be used;
7.
Chase aluminium/PVC external angles;
8.
Foam filler;
9.
Chase fiberglass mesh;
10.
Chase EPS render;
11.
Chase texture (tintable);
12.
Sealant (by builder) around windows,
penetrations, control joints and where
Chase EPS & any other substrate meet.
Optional:
• Chase Primer (tintable) (not pictured);
• Chase Membrane (tintable) (not pictured).
Summary of Contents for CONCRETE FINISH
Page 4: ...2 1 Introduction...
Page 6: ...4 2 System Summary...
Page 9: ...7...
Page 10: ...8 3 National Construction Code NCC 2019...
Page 14: ...12 4 Materials...
Page 20: ...18 5 Specifications...
Page 22: ...20 6 Installation...
Page 29: ...27 Notes...
Page 30: ...28 7 Construction Details...