COMMISSIONING
On completion of the installation and
after allowing a suitable period of
time for the fire cement and mortar to
dry out, the fire should be lit and
checked to ensure that smoke and
fumes are taken from the appliance
up the chimney and emitted safely.
Also check all joints and seals.
The central heating pump should be
adjusted to give the correct water
flow against the circuit resistance and
the system should be correctly
balanced.
On completion of the installation and
commissioning please leave the
operating instructions with the
customer and advise on the use of the
appliance and any controls on the
system.