15
English
5.3 Connect voltage measurement
For installations with power-generating equipment
Solar panels, wind power, or plans to introduce such equipment
require the voltage measurement to be connected.
For installations without power-generating equipment
Connection of the voltage measurement is optional.
Do not remove the terminal block in the bottom of the Charge
Amps Amp Guard as it may be needed if voltage measurement is
connected in the future.
IT grid networks
IT grid is used in parts of Norway, Belgium and Albania.
In IT grid installations, L2 must be connected to both L2 and N.
The network type must also be configured, see chapter Electrical
Settings.
IMPORTANT!
Each phase must be connected to the correct terminal connector
for voltage measurement to function correctly. L1, L2 and L3 must
be protected by circuit breakers in the normal way.
1. Turn the power off at the main circuit breaker panel.
2. Connect phases and neutral to the supplied terminal block.