13
English
5 Installation
Install the Charge Amps Amp Guard directly downstream of the
building’s main circuit breaker panel to monitor all power usage.
For single-phase installations, L2 and L3 shall not be used.
5.1 Mount Charge Amps Amp Guard
1. Pull the DIN-rail lock downwards and twist the Charge Amps
Amp Guard onto the DIN-rail.
2. Secure in place by pushing the DIN-rail lock back in place.
Please note that an additional slot will be needed for the power
supply.