OPERATION
INITIAL START-UP
Check your site to ensure that all plumbing and electrical connections have been properly made by
qualified personnel. Check the installation of chemical dispensing systems. Perform the following
steps to prepare your machine for operation.
1. Check the exterior of the machine for any foreign material and remove.
2. Check the interior of the machine for any foreign material and remove.
3. Remove the lower spray arms and the scrap screens.
4. Make sure that all loose tape, nut, bolts and paper have been removed from the interior.
5. Replace the scrap screen and clean if required.
6. Make sure that the upper and lower spray arms are in place and that the nozzles are clean. The
arms are held in place by knurled retaining screws. The arms are interchangeable.
7. Check the chemical supply containers and fill as required. Detergent may be introduced by hand,
for the first initial start up, on the top of the screens (follow chemical supplier’s directions).
8. Open the water supply valve. Check for leaks and take any corrective action that may be
needed.
9. Open the final rinse pet cock under the pressure gauge.
10. Check the drain and/or drain connections to ensure that drains are functional.
11. Turn the main power on at the breaker panel or fused disconnect switch.
8
Summary of Contents for PP-28 Corner
Page 4: ...REVISION RECORD CONT REVISIONS ii ...
Page 43: ...35 REPLACEMENT PARTS REPLACEMENT PARTS ...
Page 44: ...36 REPLACEMENT PARTS 5 2 5 1 5 4 3 5 5 5 6 9 7 10 11 12 A B A A 8 Figure 22 Panels ...
Page 48: ...40 REPLACEMENT PARTS 2 1 1 3 6 7 3 5 4 A A A 8 9 10 B B B Figure 24 Cable Pulley Assembly ...
Page 50: ...42 REPLACEMENT PARTS 2 3 3 4 8 7 6 5 3 5 5 5 3 9 10 1 11 12 Figure 25 Counterweight System ...
Page 64: ...56 REPLACEMENT PARTS 2 3 6 4 5 1 7 Figure 32 Scrap Screens Baskets ...
Page 75: ...67 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...75 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 84: ...76 REPLACEMENT PARTS 3 5 6 4 5 5 5 1 2 5 3 Figure 40 Side Mount Booster Cabinet ...
Page 86: ...78 REPLACEMENT PARTS 1 2 3 4 7 8 6 9 10 4 11 12 13 5 Figure 41 Pump Assembly ...
Page 88: ...80 REPLACEMENT PARTS 3 4 5 6 7 8 10 1 2 9 11 11 Figure 42 Machine Control Panel ...
Page 94: ...86 REPLACEMENT PARTS 0 1 2 1 2 3 4 6 7 8 5 Figure 45 Vent Fan Control Cabinet Optional ...
Page 98: ...90 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 99: ...91 ELECTRICAL SCHEMATICS ELECTRICAL SCHEMATICS ...
Page 103: ...98 ...
Page 104: ...99 ...
Page 105: ......